Lifted and creased tabs
Wind breaks the seal strip and lifts a course. Caught in a season it is a handful of shingles; left a winter it is a year of water running beneath them.
The warranty only counts if the roof is installed to spec ยท (609) 301-2872
A sound covering with one bad detail is a repair, not a replacement. Saying so costs us a bigger job and buys a customer who calls back.
Have the detail fixed โ (609) 301-2872Most roofs that come off early did not need to. What decides it is the condition of the covering either side of the fault and whether there is anything sound to tie a repair into โ not the age printed on the paperwork.
Wind breaks the seal strip and lifts a course. Caught in a season it is a handful of shingles; left a winter it is a year of water running beneath them.
Where two planes meet, or a roof meets a wall or chimney, is where leaks actually begin. The metal fails long before the covering around it.
The rubber collar perishes and splits at the neck. One of the commonest faults we find and among the quickest to put right.
Caps take the worst of an exposed run. Replacing a stretch is a short job that prevents a long one.
When the covering has reached the end of its life across the whole roof, when an earlier layover leaves nothing sound to tie into, or when the boards beneath the fault have already softened. In each case you get the survey notes that led to the recommendation, so you can put them to somebody else.
A full tear-off and a complete manufacturer system, fitted to the written instructions and registered afterwards.
Read the page →Tracing water from the ceiling stain back to the point it enters, then correcting the cause rather than the symptom.
Read the page →Post-storm assessment with findings recorded in detail, then repair or replacement to the same written spec.
Read the page →An hour spent above and below the covering, judging the slopes, the fastening and the ventilation against what the spec actually requires.
Read the page →The cladding below the roofline, surveyed, patched or replaced by the people already working above it.
Read the page →Seamless runs sized to the roof feeding them, with discharge far enough out to keep water off the foundation.
Read the page →An hour on site, a written estimate naming every component, and no obligation at the end of it.
Ask whether a repair will do โ (609) 301-2872